• Vatican Iron Door
  • Vatican Iron Door
  • Vatican Iron Door

Vatican Iron Door

Model No.︰

JDL-M-012

Brand Name︰

Jin-Dary

Country of Origin︰

China

Unit Price︰

US $ 335 / sq.m

Minimum Order︰

10 sq.m

Share on:

Product Description

1. Iron door info    

  • Item: Decoration Radius Top Wrought Iron Door JDL-M-012
  • Material: Wrought Iron
  • Style: Double door/ arch/round/half circle top
  • Size: 6*8ft/customized
  • Anti-Rust:sand blast, hot zinc spray, epoxy primer(twice), acrylic acid black paint, hand applied faux finish, varnish coat
  • Threshold:Intergrated threshold with door jamb to ensure the strongness of the iron door
  • Weather Stripping:Rubber weather stripping seals around jamb,door panel and glass panel
  • Polyurethane foam:Jamb,panel,threshold and kickplate are fully injected with polyurethane foam

2. Material parameters (can be customized) 

  • Jamb&Door Panel:2"x6" with 14 guage tube
  • Scroll Work: 5/8" solid steel
  • Glass:5/8" dual paned tempered glass
  • Lock Holes:2-3/8" backset,2-1/8" diameter,5-1/2" center to center

3. Manufacture procedure       

  • CAD drawing
  • Prepareing Materials
  • Assembling
  • Welding
  • Polishing
  • Sanding Blast&Zinc Spraying
  • Adjusting
  • Epoxy slurry to fill minor imperfection
  • Epoxy primer first time 
  • Epoxy primer second time
  • Acrylic acid black paint   
  • Hand applied faux finish  
  • Varnish coat  

4.Finish Option

  • Dark Copper
  • Mediumn Copper
  • Light Copper
  • Mediumn Sponged
  • Gold Rush
  • Silver Pewter
  • Warm Gold

5.Glass Option

  • Clear Glass
  • Rain Glass
  • Aquatex Glass
  • Water Glass
  • Water Cubic Glass
  • Pebble Glass
  • Frosted Glass
  • Reeded Glass

6.Packing

  • Door panel:packed with EPE, bubble wrap,corrugated paper, polywood case. “glass fragile” and “ this side up” on the crate for the convenience of discharge at your side.         
  • Door frame: packed with EPE and bubble wrap. 
  • FCL: the crate will be put in rows and the frame will be put above the crates.
  • LCL: the crates and frame will be put into two iron stands for the safety of shipping and the convenience of discharge.

7.Leading Time 

  • Lead time 1-5 sets: about 25 days 
  • 1 20ft container: about 30 days. 
  • 2-3 containers: about 40 days.
  • Delivery clause FOB Xiamen

8.Payment Term

  • Terms of payment Orders $5000 or under: full payment is expected when order is approved. 
  • Orders over $5000: 50% as deposit, balance against copy of B/L. 
  • We accept T/T and L/C for the payment.


Payment Terms︰ TT

Product Image